Oracle 正则函数使用
6个参数 第一个是输入的字符串 第二个是正则表达式 第三个是替换的字符 第四个是标识从第几个字符开始正则表达式匹配。(默认为1) 第五个是标识第几个匹配组。(默认为全部都替换掉) 第六个是是取范围: i:大小写不敏感; c:大小写敏感; n:点号 .不匹
6个参数
第一个是输入的字符串
第二个是正则表达式
第三个是替换的字符
第四个是标识从第几个字符开始正则表达式匹配。(默认为1)
第五个是标识第几个匹配组。(默认为全部都替换掉)
第六个是是取值范围:
i:大小写不敏感;
c:大小写敏感;
n:点号 . 不匹配换行符号;
m:多行模式;
x:扩展模式,忽略正则表达式中的空白字符。
全部测试数据
SQL> select * from test_reg_substr;
A
-----------------------------------
ABC123XYZ
ABC123XYZ456
替换数字
SQL> SELECT
2 REGEXP_REPLACE (a,'[0-9]+','QQQ') AS A
3 FROM
4 test_reg_substr;
A
-----------------------------------------------
ABCQQQXYZ
ABCQQQXYZQQQ
替换数字(从第一个字母开始匹配,替换第1个匹配项目)
SQL> SELECT
2 REGEXP_REPLACE (a,'[0-9]+','QQQ', 1, 1) AS A
3 FROM
4 test_reg_substr;
A
------------------------------------------------------
ABCQQQXYZ
ABCQQQXYZ456
替换数字(从第一个字母开始匹配,替换第2个匹配项目)
SQL> SELECT
2 REGEXP_REPLACE (a,'[0-9]+','Q', 1, 2) AS A
3 FROM
4 test_reg_substr;
A
---------------------------------------------------
ABC123XYZ
ABC123XYZQ
替换第二个单词
SQL> SELECT
2 REGEXP_REPLACE (a,'\w+','Kimi', 1, 2) AS A
3 FROM
4 test_reg_substr;
A
---------------------------------------------------
ABC123XYZ
ABC123XYZ456

Hot AI Tools

Undresser.AI Undress
AI-powered app for creating realistic nude photos

AI Clothes Remover
Online AI tool for removing clothes from photos.

Undress AI Tool
Undress images for free

Clothoff.io
AI clothes remover

AI Hentai Generator
Generate AI Hentai for free.

Hot Article

Hot Tools

Notepad++7.3.1
Easy-to-use and free code editor

SublimeText3 Chinese version
Chinese version, very easy to use

Zend Studio 13.0.1
Powerful PHP integrated development environment

Dreamweaver CS6
Visual web development tools

SublimeText3 Mac version
God-level code editing software (SublimeText3)

Hot Topics



The retention period of Oracle database logs depends on the log type and configuration, including: Redo logs: determined by the maximum size configured with the "LOG_ARCHIVE_DEST" parameter. Archived redo logs: Determined by the maximum size configured by the "DB_RECOVERY_FILE_DEST_SIZE" parameter. Online redo logs: not archived, lost when the database is restarted, and the retention period is consistent with the instance running time. Audit log: Configured by the "AUDIT_TRAIL" parameter, retained for 30 days by default.

The Oracle database startup sequence is: 1. Check the preconditions; 2. Start the listener; 3. Start the database instance; 4. Wait for the database to open; 5. Connect to the database; 6. Verify the database status; 7. Enable the service (if necessary ); 8. Test the connection.

The amount of memory required by Oracle depends on database size, activity level, and required performance level: for storing data buffers, index buffers, executing SQL statements, and managing the data dictionary cache. The exact amount is affected by database size, activity level, and required performance level. Best practices include setting the appropriate SGA size, sizing SGA components, using AMM, and monitoring memory usage.

Oracle database server hardware configuration requirements: Processor: multi-core, with a main frequency of at least 2.5 GHz. For large databases, 32 cores or more are recommended. Memory: At least 8GB for small databases, 16-64GB for medium sizes, up to 512GB or more for large databases or heavy workloads. Storage: SSD or NVMe disks, RAID arrays for redundancy and performance. Network: High-speed network (10GbE or higher), dedicated network card, low-latency network. Others: Stable power supply, redundant components, compatible operating system and software, heat dissipation and cooling system.

Oracle can read dbf files through the following steps: create an external table and reference the dbf file; query the external table to retrieve data; import the data into the Oracle table.

Golang regular expressions use the pipe character | to match multiple words or strings, separating each option as a logical OR expression. For example: matches "fox" or "dog": fox|dog matches "quick", "brown" or "lazy": (quick|brown|lazy) matches "Go", "Python" or "Java": Go|Python |Java matches words or 4-digit zip codes: ([a-zA

The amount of memory required for an Oracle database depends on the database size, workload type, and number of concurrent users. General recommendations: Small databases: 16-32 GB, Medium databases: 32-64 GB, Large databases: 64 GB or more. Other factors to consider include database version, memory optimization options, virtualization, and best practices (monitor memory usage, adjust allocations).

To create a scheduled task in Oracle that executes once a day, you need to perform the following three steps: Create a job. Add a subjob to the job and set its schedule expression to "INTERVAL 1 DAY". Enable the job.
