National railways will implement a new train operation chart on June 15: the Beijing-Guangzhou high-speed railway will operate at a speed of 350 kilometers per hour

WBOY
Release: 2024-06-01 14:07:04
Original
1128 people have browsed it

全国铁路 6 月 15 日实行新列车运行图:京广高铁全线 350 公里时速运营

According to news from this site on May 30, China Railway officially announced that starting from 0:00 on June 15, the national railways will implement a new train operation chart. After the map adjustment, the national railway arrangement map has 12,690 passenger trains, 205 more than the current map; 22,595 freight trains, 74 more than the current map.

The details attached to this site are as follows:

Adjustment of the Beijing-Guangzhou High-speed Railway

After the map adjustment, the entire line of the Beijing-Guangzhou High-speed Railway has been operated at a high standard of 350 kilometers per hour, and the overall transportation capacity has been improved by 4.2 %:

  • The fastest travel time between Beijing West and Guangzhou South is 7 hours and 16 minutes, compressed by 22 minutes

  • Wuhan to Guangzhou South The fastest travel time is 3 hours and 17 minutes, compressed by 23 minutes

  • The fastest travel time from Changsha South to Guangzhou South is 1 hour and 59 minutes, compressed by 19 minutes

36 additional 99 standard trains with fewer stops, fast speed and short journeys will be arranged across the entire line, 36 more than the current figure, covering 20 provincial administrative regions, and EMU trains will be added in busy sections.

  • 16 more EMU trains will be added from Zhengzhou to Wuhan

  • 16 more EMU trains will be added from Wuhan to Changsha

  • An additional 14 EMU trains will be added from Changsha to Hengyang

From 8:00 to 18:00 every day, 1 to 3 benchmark trains will be operated every hour on the Wuguang section of the Beijing-Guangzhou High-speed Railway. The number of trains received at Wuhan, Hankou, Changsha South, Guangzhou Baiyun and other hub stations increased by 13, 14, 36 and 37 respectively.

According to the train departure time and direction, the arrangement of departure trains from Wuhan to Shenzhen North and Guangzhou South will be optimized.

Optimize the train operation structure in the central and western regions

  • Add 28 more benchmark trains between cities such as Zhengzhou, Wuhan, Changsha and so on

  • Add 20 EMU trains from Zhengzhou, Taiyuan, Wuhan and other central cities to Guangzhou, Shenzhen, Zhuhai, Jinan, Lianyungang, Hangzhou, Guilin and other directions

  • Lanzhou-Xinjiang High-speed Railway has added Urumqi 2 express passenger trains each to Emei and Xi'an

  • 8 passenger trains of Lanzhou-Xinjiang Railway are adjusted to Lanzhou-Xinjiang High-speed Railway

  • Additional runs There is one benchmark train from Lanzhou West to Guangzhou South, which can reach the two places within 10 hours, 2 hours and 34 minutes shorter than the current time.

  • It is the first time to run an evening service between Nanning East and Beijing West. 2 trains to the EMU

  • are the first EMU trains to be launched between Dali and Shenzhen, Chengdu and Zhuhai, Luzhou and Beijing, Chongqing and Huangshan, etc.

  • Add 8 multiple unit trains from Kunming, Lijiang to Shangri-La

Optimize Some passenger train operation plans

  • Beijing Station has launched EMU trains running via the Beijing-Shanghai High-speed Railway, which can reach major tourist cities such as Shanghai, Qingdao, and Xiamen.

  • arranges 2 Beijing-Guangzhou High-speed Railway benchmark trains to depart from Beijing Station Depart and end at

  • 2 direct EMU trains will be operated between Shijiazhuang and Zhangjiakou stations

  • 2 additional EMU trains will be operated between Shijiazhuang and Qinhuangdao stations

  • Two more EMU trains will be opened between Beijing West and Xiongan Station

  • Normal speed passenger trains from Ulanhot to Qingdao will be opened

  • EMU trains will run from Shenyang North to Hankou,

  • 2 more EMU trains will be opened between Beijing Chaoyang and Harbin West Station

  • Arrange 38 EMU trains from Wuhan, Zhengzhou to Hangzhou and Huangshan to Shanghai, Nanjing, Hefei, Hangzhou and other directions

  • Arrange Jiuhuashan and Huangshan West Station 29 and 24 EMU trains will stop respectively

  • and 6 more EMU trains from Hong Kong West Kowloon to Guangzhou East will stop

  • and 6 additional EMU trains will stop in Hong Kong Four EMU trains from West Kowloon to Shenzhen North Station

  • run from Hong Kong West Kowloon to Zhangjiajie West EMU trains

  • are arranged based on the provincial capital city There are 12 rural revitalization trains that originate and end at the station and stop at township stations along the way, covering parts of Heilongjiang, Shandong, Shaanxi, and Hunan. The number of train stops at Leiyang, Nanjing, Ruijin and other county and city stations along the Longzhang Railway

  • Optimize the supply of freight products

increase the number of train stops The Railway Bureau Group Company has 25 express trains: 5 China-Europe trains, 2 Central Asia trains, 11 multimodal trains, and 7 intercity trains.

  • Lanzhou-Xinjiang Railway has opened 6 additional freight trains

  • Added 6 additional freight trains from Linhe to Renqiu, Huangdao to Jiexiu, and Luntai to Li 3 direct bulk cargo trains

  • An additional 32 freight trains were opened from Taiyuan to Zhongwei, Qingdao to Yancheng and other railways

  • Nanchang East to Shenzhen 2 EMU confirmed trains between stations handle high-speed rail express batch transportation

  • Newly added full timetable between Chongqing, Wuhan, Yiwu, Guangzhou, etc. and Duisburg, Germany, and Warsaw, Poland China-Europe Express

Optimize the quality of passenger and cargo transportation services

  • Optimize the service functions of railway 12306 and expand the application of new ticket products such as time tickets, fixed-term tickets, and travel packages Scope

  • Flexible discounts will be implemented on the fares of some EMU trains with low passenger occupancy rates, allowing passengers to enjoy more preferential fares

  • Optimize station trains Services, 120 stations across the country can realize convenient transfers, 80 stations provide Internet ordering services, and the railway traffic code covers all EMU trains

  • Explore new services and new measures suitable for aging, and continue to improve The quality of train catering services

  • Run tourist trains such as the "Panda Special", "Tianshan" and "Jinghe" to help the development of the tourism economy

  • Give full play to the role of 40 railway logistics centers across the country and optimize the functions of the 95306 freight platform

Tickets for the new map will be on sale one after another from June 1. After the map adjustment, train operation information and service information can be obtained through Check the railway 12306, 95306 website, client, WeChat and other channels.

The above is the detailed content of National railways will implement a new train operation chart on June 15: the Beijing-Guangzhou high-speed railway will operate at a speed of 350 kilometers per hour. For more information, please follow other related articles on the PHP Chinese website!

Related labels:
source:ithome.com
Statement of this Website
The content of this article is voluntarily contributed by netizens, and the copyright belongs to the original author. This site does not assume corresponding legal responsibility. If you find any content suspected of plagiarism or infringement, please contact admin@php.cn
Popular Tutorials
More>
Latest Downloads
More>
Web Effects
Website Source Code
Website Materials
Front End Template