Robots are on duty, State Grid Hanchuan Power Supply Company welcomes new "employees"
On June 1, on pole 5 of the Chuanliu Road Branch of the 10 kV Chengdong Second Circuit Line in Hanchuan City, on-site workers from the State Grid Hanchuan Power Supply Company successfully completed the electrical grounding inspection using a live distribution network robot. The installation of the ring marks the company’s first practical application of live work robots in distribution networks and the start of intelligent live work.
At the work site, the long mechanical arm of the yellow engineering vehicle slowly lifted up, and the mechanical small arm of the live working robot steadily extended towards the high-voltage wire.
Deng Side, chief engineer of the State Grid Hanchuan Power Supply Company: "Today we mainly use live working robots to install power inspection grounding rings to prepare in advance for future power distribution repair operations."
As the on-site operator clicks on the screen and remote control, the mechanical arm grabs the wire stripper, peels off the insulation layer, and takes out the grounding ring. In a few minutes, a new grounding ring is installed on the high-voltage line. In the past, manual live work required the cooperation of four people to operate the project, but now it can be completed by two operators.
Deng Side, chief engineer of the State Grid Hanchuan Power Supply Company: "The application of live work robots in distribution networks can effectively reduce the intensity of manual work and improve the safety and reliability of live work."
Reporter: Hang Huan
The above is the detailed content of Robots on duty, State Grid Hanchuan Power Supply Company welcomes new 'employees'. For more information, please follow other related articles on the PHP Chinese website!