How to order takeout on high-speed rail
php Xiaobian Yuzai introduces to you, high-speed rail takeout ordering to make your journey more convenient. With the development of technology, high-speed rail takeout ordering services have become increasingly popular, and passengers no longer have to worry about running out of meal options. Just open the relevant APP, select your favorite food, fill in the train seat information, and enjoy the delicious food after completing the payment. After the takeaway is delivered, the staff will deliver the meal to your seat on time without getting out of the car, which saves time and convenience. Ordering high-speed rail takeout adds a delicious experience to your journey.
How to order takeout on high-speed rail
Answer:Use 12306 to order food
specific method:
1. Open the 12306 software and find the restaurant’s specialties.
2. Then you need to enter your train number and departure time.
3. You need to select the station you want to arrive at.
4. You can order takeout inside.
5. Then enter the specific information to make the payment.
The above is the detailed content of How to order takeout on high-speed rail. For more information, please follow other related articles on the PHP Chinese website!

Hot AI Tools

Undresser.AI Undress
AI-powered app for creating realistic nude photos

AI Clothes Remover
Online AI tool for removing clothes from photos.

Undress AI Tool
Undress images for free

Clothoff.io
AI clothes remover

AI Hentai Generator
Generate AI Hentai for free.

Hot Article

Hot Tools

Notepad++7.3.1
Easy-to-use and free code editor

SublimeText3 Chinese version
Chinese version, very easy to use

Zend Studio 13.0.1
Powerful PHP integrated development environment

Dreamweaver CS6
Visual web development tools

SublimeText3 Mac version
God-level code editing software (SublimeText3)

Hot Topics

1. When the takeaway arrives at the pickup point, customers will receive a pickup notification via text message, phone call or app. 2. Go to the designated dining cabinet according to the time instructions in the notice. 3. Use WeChat to scan the QR code on the cabinet, or enter the last four digits of the orderer's mobile phone number on the cabinet screen to open the cabinet door and take out the takeout.

According to news from this site on April 25, the China Railway Group officially announced that the Chizhou-Huangshan High-speed Railway (hereinafter referred to as the Chi-Huangshan High-speed Railway) will be completed and opened to traffic on April 26. By then, Chizhou passengers taking the high-speed rail to Jiuhua Mountain and Huangshan Scenic Area will be more Convenience. In December 2019, the construction of the Chi-Huang high-speed railway started. Track laying of the entire line will be completed in September 2023, and static acceptance will begin in November 2023. On March 25 this year, we completed various joint debugging and testing tasks in a safe, high-quality, and efficient manner and successfully entered the operational test stage. The Chizhou-Huangzhou High-speed Railway is an important part of the Wuhan-Hangzhou high-speed railway channel. The line starts from Chizhou Station and ends at Yixian East Station. It shares the same station with the Huangchang Section (Anhui Section) of the Hangzhou-Changzhou High-speed Railway under construction and ends at Huangshan North Station. The line length is about 125 kilometers and the design speed is 350 kilometers per hour.

The Shantou-Shantou High-speed Railway will be officially opened on December 26, becoming an important transportation hub connecting the two cities of Shanwei and Shantou. The opening of this high-speed railway is of great significance for promoting the integrated development of eastern Guangdong and enhancing the overall economic strength of the region. On December 26, the new Guangzhou Baiyun Station was officially opened. On the same day, the Shantou South to Shanwei section of the Shantou-Shantou High-speed Railway was also put into operation. . This site noticed that the Shantou-Shantou High-speed Railway starts from Shantou Station, passes through 8 districts and counties in Shantou, Jieyang, and Shanwei, and connects to Guangzhou-Shantou High-speed Railway Shanwei Station. The total length of the line is 162 kilometers and the design speed is 350 kilometers per hour. Figure Source China Railway Official Account There are 7 stations in Shantou, Shantou South, Chaonan, Huilai, Lufengdong, Lufengnan and Shanwei. Among them, Shantou Station and Shanwei Station are existing stations, and the rest are new stations.

According to news from this site, this morning, #Why are non-seat and second-class seats the same price? became a hot search topic, causing heated discussions among netizens. A blogger said: "I have always been confused, why do high-speed trains without seats have the same price as second-class seats?" In response to this, 12306 customer service responded to the Western Decision, saying that the issue of the same price for non-seats and second-class seats is not relevant. Information reserve, but for standing tickets without seats, you can sit in an empty seat. If someone gets on the seat, you must give up your seat to the seated passenger. We will record suggestions on this issue to see if the railway department can adopt them when revising relevant fares and seats in the future. In fact, the base fares for seats without seats and second-class seats (hard seats) are the same because the operating costs of the two are the same. , all based on my country’s train ticket pricing rules based on distance, travel

According to news from this site on December 20, Meituan officially announced that on December 19, Meituan drones officially launched their first university route at the Shenzhen International Graduate School of Tsinghua University. After placing your order on site, you only need to wait for a short time to receive a glass of freshly squeezed juice. In addition to drinks and juices, fast food, Japanese food, etc. have also become the first batch of products to be accessed on this route. In the future, more categories such as barbecued meats, desserts, snacks, and daily chemical products will be introduced to enrich students' consumption choices. ▲Image source: The take-off point of the new route of the "Meituan Drone" public account is set in the Xili Yitian Holiday shopping district, 2.6 kilometers away from the Shenzhen International Graduate School of Tsinghua University. Students on campus make reservations for businesses that have access to drone delivery When ordering takeout, you can choose to have it delivered by drone to a designated landing point on campus. In terms of delivery efficiency, meals are delivered after being packaged.

According to news from this site on September 4, Guangdong released a public account showing that the longest tunnel on the Meilong High-speed Railway, the Xiahuangtian Tunnel, constructed by the China Railway 25th Bureau, has been completed, marking that all 52 tunnels on the entire line have been completed. It is expected to be completed in June next year. Open to traffic. This site learned from the public account that the main line of the Meilong High-speed Railway is approximately 93.98 kilometers long. It is the first fully invested and constructed high-speed rail project with a speed of 350 kilometers per hour in Guangdong Province. The line leads from the Meizhou West Station of the Meishan-Shantou High-speed Railway, passes through Meixian District of Meizhou City, Xingning City, Wuhua County and Longchuan County of Heyuan City, and ends at the Longchuan West Station of the Gan-Shenzhen High-speed Railway. After the Meilong High-speed Railway is completed and opened to traffic, the travel time from Meizhou to Guangzhou, Shenzhen and other cities in the Guangdong-Hong Kong-Macao Greater Bay Area will be shortened from 6 hours to 1.5 hours. Advertising Statement: External jump links (including but not limited to hyperlinks) contained in the article

According to news from this website on December 26, China Railway International Co., Ltd. stated on the 25th that as of December 24, the Jakarta-Bandung high-speed railway, the flagship project of China-Indonesia jointly building the "Belt and Road" cooperation, has sent more than 1 million passengers. On the 23rd, the weekend coincided with the local public holiday, and the passenger flow at Halim Station in Jakarta increased significantly. China High Speed Railway Co., Ltd. in Indonesia is responsible for operating the Jakarta-Bandung high-speed railway. Based on the pre-sale of train tickets, it will promptly adjust and optimize the train operation chart and increase the number of EMU trains to further improve transportation capacity. On September 7, 2021, China and Indonesia cooperated The Jakarta-Bandung high-speed railway under construction was officially put into operation, and on October 17, it was also officially opened to the outside world. This high-speed railway will significantly shorten the journey between Jakarta and Bandung

News from this site on July 13. According to "CCTV News", at 8:00 on July 13, the joint commissioning and testing of the Weifang-Yantai High-speed Railway (hereinafter referred to as the "Weiyan High-speed Railway") was officially launched, and the countdown to operation has entered. The main line of Weiyan High-speed Railway has a total length of 237.3 kilometers and a design speed of 350 kilometers per hour. The line passes through Changyi City in Weifang, Pingdu City in Qingdao, Laizhou City, Zhaoyuan City, Longkou City, Penglai District, Development Zone, Fushan District and Zhifu District in Yantai. Construction of the line started in December 2020, and static acceptance was completed in early July 2024. The entire line has 10 stations including Changyi, Huibu, Laizhou, Zhaoyuan, Longkou City, Penglai City, Yantai West, Fushan, Zhifu and Yantai South. Among them, Huibu Station, Laizhou Station, Zhaoyuan Station, Yantai West Station and Fushan Station are five new stations. Shandong Weiyan High-speed Railway
