Intel Core Ultra 300 Series Panther Lake Processor ID Exposed, Equipped with GT2/3 Two Core Displays

WBOY
Release: 2024-05-09 18:30:36
forward
1108 people have browsed it

According to news from this site on May 9, Intel confirmed last month that Panther Lake will soon be put into production, and this series of processors is expected to be unveiled in mid-2025.

Panther Lake marks a major shift for Intel, starting with this generation, Intel will use the next generation Intel 18A process technology to produce consumer client products.

Today, @InstLatX64 dug up the relevant PCI ID of Panther Lake. The PTL device IDs of the A0 and B0 steps were confirmed to be 0xC06C0 and 0xC06C1. In addition, Lunar Lake currently has two A0 step IDs, namely 0xb06d0 and 0xb06d1.

英特尔酷睿 Ultra 300 系列 Panther Lake 处理器 ID 曝光,配备 GT2/3 两种核显

In addition, the core display ID of the Panther Lake-P series processor has also been announced. In line with previous revelations, Intel will provide two versions, GT3 and GT2. The specific specifications are temporarily unknown. Not sure.

英特尔酷睿 Ultra 300 系列 Panther Lake 处理器 ID 曝光,配备 GT2/3 两种核显

英特尔酷睿 Ultra 300 系列 Panther Lake 处理器 ID 曝光,配备 GT2/3 两种核显

Intel also announced the Panther Lake "PTL-U" processor test tool a few days ago. This site noticed that the title of this CPU test tool also mentioned the form factor of BGA 2540, which may represent an early RVP (Reference Evaluation Platform).

The current reliable news about Intel's Panther Lake series processors is not very big. It is expected to provide SKUs for desktop and mobile platforms. The computing unit will be composed of the next generation Cougar Cove and Skymont. The GPU integrated display is expected to use Arc Celestial. "Xe3" architecture.

The series is expected to continue to use the LGA 1851 socket, which will arrive with Meteor Lake-PS and Arrow Lake-S CPUs.

Intel CEO Pat Gelsinger said that its AI performance will be "increased by another 2x" based on Lunar Lake (three times Meteor Lake performance).

Intel Panther Lake expected specifications:

Core Ultra300 naming

Based on Intel 18A process

P core adopts Cougar Cove architecture

E The core adopts Skymont architecture

Arc Celestial “Xe3” integrated display

NPUAI performance increased by 2 times

LGA 1851 slot

Coming to market in 2025

英特尔酷睿 Ultra 300 系列 Panther Lake 处理器 ID 曝光,配备 GT2/3 两种核显

The above is the detailed content of Intel Core Ultra 300 Series Panther Lake Processor ID Exposed, Equipped with GT2/3 Two Core Displays. For more information, please follow other related articles on the PHP Chinese website!

Related labels:
source:ithome.com
Statement of this Website
The content of this article is voluntarily contributed by netizens, and the copyright belongs to the original author. This site does not assume corresponding legal responsibility. If you find any content suspected of plagiarism or infringement, please contact admin@php.cn
Popular Tutorials
More>
Latest Downloads
More>
Web Effects
Website Source Code
Website Materials
Front End Template