The order of the oracle database startup steps is
The Oracle database startup sequence is: 1. Check the preconditions; 2. Start the listener; 3. Start the database instance; 4. Wait for the database to open; 5. Connect to the database; 6. Verify the database status; 7 . Enable the service (if required); 8. Test the connection.
Oracle Database Startup Step Sequence
Starting an Oracle database involves a series of ordered steps to ensure that the database is functioning properly start up. The following is the sequence of steps for Oracle database startup:
1. Check the prerequisites
- Make sure all necessary hardware and software are installed.
- Verify that the operating system environment variables are set correctly.
2. Start the listener
- The listener is a service that listens for connection requests from clients.
- Use the command "lsnrctl start" to start the listener.
3. Start the database instance
- Use the command "sqlplus /nolog" to connect to the database.
- Enter the "startup" command to start the database instance.
4. Wait for the database to open
- It takes a while for the database to open, depending on the size and complexity of the database.
- Wait for the database to display the "Database is open" message.
5. Connect to the database
- Use the "connect" command to connect to the database.
- Please enter your username and password.
6. Verify the database status
- Use the "show parameter status" command to verify the database status.
- Make sure the database is in "OPEN" status.
7. Enable Services
- If necessary, you can enable additional Oracle services.
- Use the command "lsnrctl create service" to create a service.
8. Test the connection
- Use a client tool or application to test the connection to the database.
- Ensure that you can successfully connect and execute queries.
The above is the detailed content of The order of the oracle database startup steps is. For more information, please follow other related articles on the PHP Chinese website!

Hot AI Tools

Undresser.AI Undress
AI-powered app for creating realistic nude photos

AI Clothes Remover
Online AI tool for removing clothes from photos.

Undress AI Tool
Undress images for free

Clothoff.io
AI clothes remover

AI Hentai Generator
Generate AI Hentai for free.

Hot Article

Hot Tools

Notepad++7.3.1
Easy-to-use and free code editor

SublimeText3 Chinese version
Chinese version, very easy to use

Zend Studio 13.0.1
Powerful PHP integrated development environment

Dreamweaver CS6
Visual web development tools

SublimeText3 Mac version
God-level code editing software (SublimeText3)

Hot Topics



The retention period of Oracle database logs depends on the log type and configuration, including: Redo logs: determined by the maximum size configured with the "LOG_ARCHIVE_DEST" parameter. Archived redo logs: Determined by the maximum size configured by the "DB_RECOVERY_FILE_DEST_SIZE" parameter. Online redo logs: not archived, lost when the database is restarted, and the retention period is consistent with the instance running time. Audit log: Configured by the "AUDIT_TRAIL" parameter, retained for 30 days by default.

The Oracle database startup sequence is: 1. Check the preconditions; 2. Start the listener; 3. Start the database instance; 4. Wait for the database to open; 5. Connect to the database; 6. Verify the database status; 7. Enable the service (if necessary ); 8. Test the connection.

The amount of memory required by Oracle depends on database size, activity level, and required performance level: for storing data buffers, index buffers, executing SQL statements, and managing the data dictionary cache. The exact amount is affected by database size, activity level, and required performance level. Best practices include setting the appropriate SGA size, sizing SGA components, using AMM, and monitoring memory usage.

Oracle database server hardware configuration requirements: Processor: multi-core, with a main frequency of at least 2.5 GHz. For large databases, 32 cores or more are recommended. Memory: At least 8GB for small databases, 16-64GB for medium sizes, up to 512GB or more for large databases or heavy workloads. Storage: SSD or NVMe disks, RAID arrays for redundancy and performance. Network: High-speed network (10GbE or higher), dedicated network card, low-latency network. Others: Stable power supply, redundant components, compatible operating system and software, heat dissipation and cooling system.

Oracle can read dbf files through the following steps: create an external table and reference the dbf file; query the external table to retrieve data; import the data into the Oracle table.

The amount of memory required for an Oracle database depends on the database size, workload type, and number of concurrent users. General recommendations: Small databases: 16-32 GB, Medium databases: 32-64 GB, Large databases: 64 GB or more. Other factors to consider include database version, memory optimization options, virtualization, and best practices (monitor memory usage, adjust allocations).

To create a scheduled task in Oracle that executes once a day, you need to perform the following three steps: Create a job. Add a subjob to the job and set its schedule expression to "INTERVAL 1 DAY". Enable the job.

Oracle Database memory requirements depend on the following factors: database size, number of active users, concurrent queries, enabled features, and system hardware configuration. Steps in determining memory requirements include determining database size, estimating the number of active users, understanding concurrent queries, considering enabled features, and examining system hardware configuration.
